EXA Infrastructure Expands With Second Terrestrial Transport Route in Iberian Peninsula
14/12/2022
Related Articles
London Stock Exchange datacentre migration project secures low-latency network support from EXA
The London Stock Exchange Group is gearing up to shutter its primary City of London datacentre by the end of August 2022, while work continues on building out its new facility
Thursday Bytes: EXA, BAI, ZenFi, GBI, Infinera, Lumen
EXA Infrastructure is building a new dedicated Open Cable Landing Station in Sicily. It will be in Mazara del Vallo on the Italian island’s southeastern shoreline, and will consolidate existing landing sites there into a scalable next generation facility better able to address the needs of a rapidly changnig market. Sicily’s importance as a hub between Europe, Africa, and Asia has been steadily growing for a while now.
EXA arrives at Namex Bari: active access to the network of submarine cables
All providers active at the Apulian interchange point will be able to access the player's infrastructure, including the Trans Adriatic Express cable, the new low-latency route between Italy, Albania, Greece and Turkey. CEO Goretti: "Italy's role in the Mediterranean is stronger"